Sign In  |  Register  |  About Livermore  |  Contact Us

Livermore, CA
September 01, 2020 1:25pm
7-Day Forecast | Traffic
  • Search Hotels in Livermore

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Weston wins $520M Task Order to provide temporary power generation at San Juan Plant in San Juan, PR

By: Prodigy
08/01/2023, West Chester, PA // PRODIGY: Feature Story //

 Weston Solutions, Inc. (Weston) has won a second task order under its United States Army Corps of Engineers (USACE) Omaha Rapid Disaster Infrastructure (RDI) contract to supply temporary power generation at the San Juan Power Plant in San Juan, Puerto Rico in support of its overall mission to stabilize the electrical grid on the island. The temporary generators are expected to enable maintenance and repair work on Puerto Rico’s power system and energy grid. The task order totals $522,837,996 over an 8-month period of performance.

After Hurricanes Irma and Maria in 2017 and Hurricane Fiona in 2022, it became clear that Puerto Rico’s power generation, distribution and transmission was in a precarious state. In response, a presidential declaration was issued September 18, 2022. The Federal Emergency Management Agency (FEMA) tasked USACE with adding 200 Megawatts (MW) of power at the San Juan Power plant to mitigate the threat.

After a competitive process, USACE selected Weston as their contractor.

“Weston is proud to support USACE Omaha and the Puerto Rico Power System Stabilization Task Force team on this important mission,” said Weston Vice President and Client Sector Leader, Chris Henry.

In combination with the funds awarded for temporary power generation at the Palo Seco Power Plant in March 2023, nearly $1 billion has been awarded for the delivery of critical services by Weston. Our team includes NFE Power PR LLC and NFEnergía LLC, subsidiaries of New Fortress Energy Inc., for the installation and operations of 200 MW of dual-fuel generators as well as the supply of natural gas.

About Weston Solutions

Weston Solutions is a U.S.-based, 100% employee-owned environmental and infrastructure services firm committed to safety and client value, driven to be our client’s most effective and efficient service provider. For over 65 years, we have solved our client’s challenges with a passion to serve and a drive to make a difference.

Weston Solutions, Inc.
1400 Weston Way
West Chester, PA
(610) 701-3000

Media Contact: Peter Bujok



Source: Prodigy.press

Release ID: 666147

Original Source of the original story >> Weston wins $520M Task Order to provide temporary power generation at San Juan Plant in San Juan, PR



Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 Livermore.com & California Media Partners, LLC. All rights reserved.