Sign In  |  Register  |  About Livermore  |  Contact Us

Livermore, CA
September 01, 2020 1:25pm
7-Day Forecast | Traffic
  • Search Hotels in Livermore

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

My ADU Delivers Expertly Crafted and Energy-Efficient Accessory Dwelling Units (ADUs) with a Streamlined Building Process

US - My ADU was established in 2019 to meet the increasing demand for affordable housing solutions. The company leverages over three decades of experience in the custom home-building industry to offer expertly crafted Accessory Dwelling Units (ADUs). With a deep understanding of residential design, permitting, and construction, My ADU provides homeowners with a straightforward and efficient solution for adding functional living spaces right in their backyards.

The company’s approach to constructing ADUs involves traditional, stick-built methods that meet all necessary building codes for family homes. This process not only enhances the safety and durability of the structures but also increases their overall value. Each ADU is designed and constructed with energy efficiency in mind, incorporating energy-efficient and Energy Star-certified products to ensure a comfortable living environment that minimizes energy costs.

My ADU prides itself on delivering ADUs ready for move-in within a remarkably short timeframe. Utilizing local resources, suppliers, and extensive building industry knowledge, My ADU can complete most projects in as little as 12 weeks. This efficiency and a commitment to quality craftsmanship make My ADU a preferred choice for homeowners seeking to maximize their property’s potential.

The process begins with an initial site visit, where My ADU experts assess the property, discuss model options, and determine eligibility for an ADU. This crucial step allows for creating an accurate and personalized project estimate. Following the site visit, My ADU handles all aspects of the permitting process, ensuring that all municipal requirements are met, including site plans, erosion control measures, and engineering approvals.

Once the necessary permits are secured, My ADU moves forward with the construction phase, managing everything from site preparation and foundation work to the final finishing touches. Each project is completed through a conventional construction process, with rigorous inspections conducted by the local municipality to ensure the highest safety and compliance standards.

Upon completion, My ADU conducts a final walk-through with the homeowner, discussing any final adjustments and ensuring satisfaction before handing over the keys. With a certificate of occupancy in hand, homeowners can move into their new ADU, confident in the quality and durability of their new living space.

My ADU's strong reputation is built on trust, expertise, and a proven track record of delivering high-quality ADUs. The company’s commitment to excellence is evident in every project, from the initial consultation to the final handover. Homeowners can rely on My ADU to provide a seamless, end-to-end service that transforms their property into a more functional and valuable asset.

For those interested in adding an ADU to their property, contact My ADU to schedule a consultation and learn more about how their one-stop-shop approach can make the process straightforward and stress-free. 

About My ADU

Founded in 2019, My ADU was created to address the growing need for high-quality, affordable housing solutions. With over 30 years of experience in custom home building, My ADU specializes in designing, permitting, and constructing Accessory Dwelling Units (ADUs). The company’s one-stop-shop approach ensures a seamless process from initial consultation to project completion, providing homeowners with expertly crafted, energy-efficient ADUs in as little as 12 weeks.

Media Contact

Name
My ADU
Contact name
Luke Shaffer
Contact phone
(360) 309-6134
Contact address
10110 NE 13th Ave
City
Vancouver
State
WA
Zip
98686
Country
United States
Url
https://myadu.com/

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 Livermore.com & California Media Partners, LLC. All rights reserved.